Master bath renovation :: progress on the tub surround
Since the backer board went up on our twisted studs, I’ve spent quite a bit of time correcting the depth differentials of all the surfaces. Grr. I was hoping that two days would be the most spent on this step. It’s taken six days. And since I didn’t read the installation guide until afterward, I…